Showing posts with label compost-heap maintenance. Show all posts
Showing posts with label compost-heap maintenance. Show all posts

Tuesday, 17 July 2018

23 Green-Gym Sessions until Christmas


By ‘C’ and the Session Leader:

Only the third warmest and driest summer for a century it may be in England, but perhaps it is precisely because it is the hottest since 1976 that there are retailers who would have us thinking about Christmas.

Do you feel cooler if you contemplate this?
First sign of (commercial) Xmas 2018,
spotted in Wallingford Oxon, 12 July

The range of tasks on offer today may have had a certain Santa-Claus largesse feel about it: moving compost heap from yard to woodland-area, where it can be a reptile habitat; stripping paint off a garden bench ready for oiling; clearing reeds overgrowing boardwalk; sweeping leaves and brushing cobwebs off landing stage; removing nettles; sweeping and tidying slipway; clearing floating-weed from pond, and topping up the water level; and fixing new hook on Reserve gate.  There was, however, no winter-related reason for this sudden abundance: it was just that there were large numbers of volunteers today; and tomorrow is the day of the ‘Goring Gap in Bloom’ inspection! 

The most noticeable thing on arrival was that a great many more notice-boards had been put up at the site since we were last there.  Very smart they look too:


Approach from South Stoke (beside Ridgeway footpath)

Approach from Goring

Directions for those with wheels - note the flourishing hedge on the left, planted and cared for at intervals by us

The big task was to move the compost heap.  


We always hope that Green-Gym teams will execute their tasks as beautifully as a Perisic or Mbappé and team-mates, rather than those whose job it was to prepare some of the ceremonial the day before in a city where minds were perhaps already focussed on toasting Les Bleus?  And we are always keen to complete a job.

Not everything, however, goes entirely to plan, not even at Green Gym.  The session leader himself was spotted confidently setting off with a barrowload of compost from the yard area …






















only to have to stop, moments later, to ask the way:


The task looked easy enough.  For the most part it was, once we had all got ourselves orientated, and acquired shovels to use alongside pitchforks.  The only difficulty was that there was much more to move than first appeared.  One volunteer was convinced that this compost heap had Tardis-like properties.  The team (by now with several substitutions) was still going strong on this at the end of the session – and no, this is not a posed photo:


Elsewhere, one set of tools not usually used at Green Gym had been set out, more in hope than in expectation that there would be a rush of volunteers to use them:


Indeed there was no great rush of Green-Gymmers to start sanding and oiling benches, but those who did go for it, did so with gusto.  By session end, not only had the first bench been stripped of its old paint, but it and another one had been oiled as well:



Meanwhile, one volunteer had got stuck into wielding a broom on the landing stage.  Leaf-sweeping, easy.  Cobweb removal required some patience and persistence – would not have been a job for an arachnophobe!


Other volunteers turned their hand to dealing with nettles which had grown far too big for their boots:





Most volunteers, however, disappeared to ‘side up’ the pathways on site, including the boardwalk:


They ‘disappeared’ in the sense that the foliage often made it hard to see even the next person working alongside, also in the sense that the session leader spent some considerable time looking for them, to no avail:



It turned out that while he was off searching for them, they had already returned to base for half-time!


As ever, there was some improvisation of coffee-tables – as well as a chance to remove excess layers on a warm day:


And as often, there was some special delicacies to sample.  This time, maple creme cookies (biscuits à la crème d’érable):


For today we had visitors from Canada.  They are ‘regulars’, as they have been coming, at intervals of 18 months - 2 years, all the way across the Atlantic to do Green Gym ;) since the days when one of the family was earning one of these for time spent doing conservation work:

Scout badges
In the second half, Team Canada made short work of leaf-litter on the slipway, with some slick passing between players:



The simplest job of all, it turned out, had already been done: to put a new hook on a Reserve gate.   So as volunteers became free from their other tasks, they attended to the tasks which felt never-ending: compost-heap removal; and nettle-pulling.  The compost heap would have needed another hour’s working on it; fortunately, the judges are not expected until tomorrow afternoon.  As for nettle-pulling, well that really is a never-ending job at that site, but you could see that progress was being made:


Oh, and there was one job still waiting to be done:

A pond which could use a top-up

All the same, we think/hope the squad did a good job (on a fait du bon boulot).  By session-end our minds were certainly turning to other matters.

For our day also featured feasting and festive quiz.  That is because today was our AGM.  And Wallingford Green-Gym AGMs are done in style, ie informally, over lunch at a nearby hostelry:


Each year we try to present the information about the previous year in a different format.  This time, it was incorporated into a quiz which had a numerical theme.  Which proved absorbing, but very hard.  Well done to our winners! who included one of our Canadian colleagues.  [Je pense que cela mérite des félicitations. – Ed.]

Until next time – à la prochaine!

Tuesday, 8 March 2016

Beetlemania


By the session leaders:

“Nice sunny day!” called out one volunteer as we arrived – wholly ironically, for there was a distinct nip in the air:

Another recalled that dawn had been so spectacular that for a moment she had wondered if it was the Aurora Borealis come unusually far south.

In this case, however, ‘red at morning’ proved to be good news.  For it rained just enough early on in in the day that the main task scheduled for us – painting outdoor furniture – was off.  From PoV of volunteers this was good, because Green-Gymmers prefer sessions which are “a bit more physical.”

There was certainly plenty of ‘physical’ on offer, and the range of tasks was definitely unusual, even for this site.  First there was outdoor-furniture moving, as soon as site staff had turned up with the key to a gate:

Take it from us: pulling a trolley loaded with a table, across uneven, claggy ground is quite physical.  The furniture then had to be tested, according to the strict health & safety regulations which apply to all poolside patio furnishings:


Then there was the digging.  Lots of digging.  One group was digging around the sides of a compost heap, which was threatening to overwhelm the fencing around it.  To mark International Women’s Day, we shall give you photos which – when it comes to the ‘physical’ – feature the women in the team:

Male and female alike, members of the group still had time and breath left to engage in another important Green-Gym activity: chatting. 

First topic today (for reasons not entirely clear to us, except that one of our number is a devoted Devonian): when consuming scones, is it jam before cream, or cream first, then a layer of jam?  Answer: “There’s no right way, except my way: cream – jam – cream again.”

Spurred on by dreams of summer and clotted-cream teas, the group shifted large quantities of compost away from the fence, to prevent the posts from rotting ...

and attached (precision work, this) a barrier to protect from further damage:


Deep in the woods, a third group was definitely acting in a suspicious manner:

A closer look suggested that “constructing a beetle-habitat” might be just another term for ‘digging’.  Specifically, digging a hole in the ground:

The specification for this particular roundish hole was that it should be 60 cm deep.  
By tea-break, it was 40 cm deep.

By then, normal Green-Gym weather-service had resumed.  The sun was not quite out, but the day had fined up nicely.

Re-invigorated by traditional Green-Gym tea/coffee and cake (or fruit, for the one keeping Lent), the workforce soon took the excavation down to the required depth.  Then the task became more artistic, for into the hole were placed pieces of rotten wood, which will apparently make for the perfect residence for stag-beetle larvae:
As the larvae may spend up to 7 years there, it is important that their dream home in the country is constructed to the highest standard.  Here volunteers are not so much fixing a hole as adding the finishing touches to meet the exacting requirements of the most discerning of customers:


Meanwhile, the compost-heap repair and maintenance being completed ...

after the break some of that workforce was re-assigned to repair and maintenance of the French drain we had built in a previous season.  The drain (a trench filled with pebbles) was working well enough to direct surface- and groundwater away from the nearby study centre.  The pebbles, however, in settling had sunk below the level of the path; and that had created a trip hazard.  A top-up of material was therefore required:
This job too was finished off to the satisfaction of some highly dedicated workers:
No mole hill was disrupted in the landscaping of this French drain

At session end there was some discussion about what the finished piece of domestic architecture should be called.  Although there was some talk of it resembling the work of Antoni Gaudí, in the end it was decided that the beetles’ new home had to be designated The Cavern: