Tuesday, 8 March 2016

Beetlemania


By the session leaders:

“Nice sunny day!” called out one volunteer as we arrived – wholly ironically, for there was a distinct nip in the air:

Another recalled that dawn had been so spectacular that for a moment she had wondered if it was the Aurora Borealis come unusually far south.

In this case, however, ‘red at morning’ proved to be good news.  For it rained just enough early on in in the day that the main task scheduled for us – painting outdoor furniture – was off.  From PoV of volunteers this was good, because Green-Gymmers prefer sessions which are “a bit more physical.”

There was certainly plenty of ‘physical’ on offer, and the range of tasks was definitely unusual, even for this site.  First there was outdoor-furniture moving, as soon as site staff had turned up with the key to a gate:

Take it from us: pulling a trolley loaded with a table, across uneven, claggy ground is quite physical.  The furniture then had to be tested, according to the strict health & safety regulations which apply to all poolside patio furnishings:


Then there was the digging.  Lots of digging.  One group was digging around the sides of a compost heap, which was threatening to overwhelm the fencing around it.  To mark International Women’s Day, we shall give you photos which – when it comes to the ‘physical’ – feature the women in the team:

Male and female alike, members of the group still had time and breath left to engage in another important Green-Gym activity: chatting. 

First topic today (for reasons not entirely clear to us, except that one of our number is a devoted Devonian): when consuming scones, is it jam before cream, or cream first, then a layer of jam?  Answer: “There’s no right way, except my way: cream – jam – cream again.”

Spurred on by dreams of summer and clotted-cream teas, the group shifted large quantities of compost away from the fence, to prevent the posts from rotting ...

and attached (precision work, this) a barrier to protect from further damage:


Deep in the woods, a third group was definitely acting in a suspicious manner:

A closer look suggested that “constructing a beetle-habitat” might be just another term for ‘digging’.  Specifically, digging a hole in the ground:

The specification for this particular roundish hole was that it should be 60 cm deep.  
By tea-break, it was 40 cm deep.

By then, normal Green-Gym weather-service had resumed.  The sun was not quite out, but the day had fined up nicely.

Re-invigorated by traditional Green-Gym tea/coffee and cake (or fruit, for the one keeping Lent), the workforce soon took the excavation down to the required depth.  Then the task became more artistic, for into the hole were placed pieces of rotten wood, which will apparently make for the perfect residence for stag-beetle larvae:
As the larvae may spend up to 7 years there, it is important that their dream home in the country is constructed to the highest standard.  Here volunteers are not so much fixing a hole as adding the finishing touches to meet the exacting requirements of the most discerning of customers:


Meanwhile, the compost-heap repair and maintenance being completed ...

after the break some of that workforce was re-assigned to repair and maintenance of the French drain we had built in a previous season.  The drain (a trench filled with pebbles) was working well enough to direct surface- and groundwater away from the nearby study centre.  The pebbles, however, in settling had sunk below the level of the path; and that had created a trip hazard.  A top-up of material was therefore required:
This job too was finished off to the satisfaction of some highly dedicated workers:
No mole hill was disrupted in the landscaping of this French drain

At session end there was some discussion about what the finished piece of domestic architecture should be called.  Although there was some talk of it resembling the work of Antoni Gaudí, in the end it was decided that the beetles’ new home had to be designated The Cavern:

Tuesday, 1 March 2016

Hooray for coppicing!


By the session leader:

Today we were back at the Earth-Trust arboretum, where we have coppiced before.  

As last time, we trimmed hazel to size, and made bundles of stakes and binders ready for the hedge-layers, later in the week.

Unusually for Green Gym, we started in drizzle with grey sky. 

Working in pairs …


we sorted and stacked the timbers very neatly …

and left beautiful coppiced stools: 

For tea, we hid from the wind in the Poly tunnel (with ne’er a parrot in sight):

We also found treasure in the form of a Rabon Chesterman tape measure, with its stitched leather cover and brass handle.  Inches on one side, with links on the other:

“A link?  What’s that, and how long is it?”

Answer: it is 1/100 of a chain.  And a chain measures 66 feet, or 22 yards, or 4 rods (20.1168 m).  There are 10 chains in a furlong, and 80 chains in one statute mile.  An acre is the area of 10 square chains (1 chain x 1 furlong).

Then we have the cubit.  That is the distance you leave between stakes when you are laying a hedge.  It is elbow to fist, or basically 18".  Noah’s ark was 300 cubits long, its width 50 cubits, and its height 30 cubits.

Other excitement today was our woolly friends being moved along our path.  We were instructed to “stand still and look the other way.”  Sure enough the sheep trundled past happily, all apart from one hapless and sickly sheep, who had a ride in the tractor bucket.

By the end of the session the sun shone.  Just like the previous time we were here with a gymmer who has since fled to France: 


Tuesday, 23 February 2016

Repairs and Maintenance



By the session leader:

Our skills at creating and maintaining dead-hedge fences have improved over the years.  Today’s site was the one at which we have had most practice. 

It promised to be a nice, dry, bright day, and we looked forward to seeing how our previous years’ hedges had faired.  Some volunteers simply discounted reports that one section had “fallen over.”  Some were stolidly convinced that it could not have been a section we had constructed, which had failed.  Others of us were crossing our fingers and hoping.

The section concerned had been one of our earliest attempts at dead-hedge fencing.  It was still holding, and doing its job; but had sagged badly on one side – beside the public footpath – and was looking very sad:


The good news (from our PoV) was that it was not the bits we had constructed, which had failed, but the original chestnut-paling stakes, which we had incorporated into the design for the new dead-hedge fence.   With a good turnout today, and a coordinated team effort, we got the fence back upright again:


We couldn’t stand there for ever holding it up, so we decided that it needed partial dismantling and more stakes driven in on both sides.

No this is not a murder attempt …
just one of the many stakes being supported by one brave volunteer while another drives it home.

After coffee, two of the team continued reinforcing the hedge by wiring together stakes from opposite sides to give mutual support.  There was a certain make-and-mend aspect to this, as the wire was all scavenged from elsewhere on site, where previous work parties (not us!) had left behind strands of redundant wire.

The rest of the team toured the other side of the Abbey grounds to check on what else could be done.  On the way we came across this beautiful spring display of daffodils …

or rather what would be a beautiful spring display of daffodils if drooping bushes and brash were not trying to smother it.  The whole area needed to be seriously tidied up:



To our delight the dead hedge on the road side was as solid as a rock, well not literally.  Just as well, as that is the hedge seen by all the drivers and walkers that traverse the village.

Then at the end we returned to search for the missing two members of the team that we thought might have been taking it easy – only to find that they had completed yet another task, levelling an area of ground that had dips and trip hazards.

A pleasant day, and satisfying in that we completed all the tasks requested: more than had been expected.  An extra bonus for some volunteers – unfortunately not including the photographer – was coming across three deer.  After much deliberation, it was decided that although in the same sector, the animals were different species: the small one, probably muntjac; the other two, roe deer.